The following activities were carried out in this project:
- Biogeochemical characterisation of the materials in the Tajo SPS.
- Assessment of environmental risks by means of geospatial modelling and environmental analysis, as well as treatment needs.
In this way, it was possible to formulate and design the integral closure for an entire sector of the Tajo.